Isometric to weld log

From isometric drawings to a validated weld log

Building a weld log by hand from an iso package means hours of reading title blocks, counting welds and cross-referencing the BOM. IsoLog does that extraction and the cross-check, and a weld mapper reviews every row before it reaches you.

How it works

  • Upload the iso PDFs, the BOM, and your log template or numbering rules
  • Weld data is pulled from every sheet: line number, weld number, size, schedule, material, joint type
  • Each weld is checked against the BOM and across the package for duplicates, gaps and spec conflicts
  • A weld mapper reviews the log and the discrepancy report, then it is delivered within 48 hours

Why the cross-check matters

A schedule called SCH 80 on the iso and SCH 40 on the BOM is a small line on paper and a rework ticket in the field. Catching it before fit-up is cheaper than catching it at NDE or turnover.

Delivered in your format

Logs come back in Excel, laid out to match your existing template, with a separate discrepancy sheet your QC lead can work through and close out.

Common questions

What file formats do you accept?
PDF isometrics are preferred. BOMs and templates can be PDF, Excel or CSV. Up to 100 MB per file.
Can the log go straight into our weld tracking software?
Yes. The log is delivered in Excel mapped to your template, which imports into most weld tracking and QC systems.
What does the BOM cross-check catch?
Schedule and size mismatches between the iso and the BOM, material grade conflicts, missing or duplicate weld numbers, and welds that appear on one sheet but not the matching continuation.
Are our drawings kept confidential?
Yes. Files are stored privately, seen only by IsoLog, never shared or reused, and deleted on request after delivery.

Try it on your own drawings

Upload 5 isos and the BOM. Your sample weld log comes back within 48 hours, free.

Upload isos